S.A. Boggs
08-30-2024, 10:10
Starting around the 10th I will have tolerable daytime temps to permit easy bullet casting, and I have a lot to do. I am looking at using around 1/4 ton of Lyman #2 for my pistol loading thru the winter months. I will also go back to working on my train layout that I haven't touched in 6 months. I am upgrading the control to a more powerful one to power more things, new engines and static train displays.
Just talked to my old boss and he wants to get rid of much of his layout and I am going to take a look and see what, if any, I can incorporate into my layout.
Sam
Just talked to my old boss and he wants to get rid of much of his layout and I am going to take a look and see what, if any, I can incorporate into my layout.
Sam